Camas-Washougal logo tag

Army Corps sets meetings on $1.5B underwater power line

Proposed project would stretch 100 miles under the Columbia River

By
timestamp icon
category icon Business, Environment, News
Washington State Energy Facility Site Evaluation Council member Blake Nelson, right, examines a cross-section of a transmission cable to be used in the Cascade Renewable Transmission project during a Nov. 17 public meeting at Black Pearl on the Columbia in Washougal. (Taylor Balkom/The Columbian files)

The U.S. Army Corps of Engineers announced it will hold two online public meetings later this month to get feedback on a $1.5 billion project to run a 100-mile-long high-voltage power line under the Columbia River.

The announcement closely followed a notice from the federal agency earlier this month that it will do its most thorough type of environmental assessment into the project, which would connect power generation infrastructure east of the Cascade Mountains to where electricity is consumed along the Interstate 5 corridor.

Thank you for reading the Post-Record.

Subscribe now to get unlimited access.

Already a subscriber? Sign in right arrow icon